top of page

I have worked with following companies as an employee, please click on the logo to see the projects.

vconstruct-logo.png

vConstruct is a subsidiary of DPR Construction in the US, which works majorly on high-end projects in the USA with BIM. 

raumfeld is an architectural design firm based in Dresden Germany, and majorly works with all Leistungsphasen from LP1 -LP9 in wide variety of projects.

LLA logo.jpg

LLA is Kuala Lumpur based architectural design firm, mostly working with MCA - Malaysian Chinese Association high-rise projects.

MyInnoSpace is a design firm based in south India, doing projects in various fields ranging from Architecture to Interior Design.

Project Engineer - VDC (Virtual Design and Construction)

Block-185-curve (1).jpg

Block

185

BIM Coordination, Tenant Improvement

PROJECT TYPE: COMMERCIAL
AREA: 144928 Sq. M.
COST: $55 Million

Responsibilities 

BIM coordination (Navisworks) and modelling (Revit) of 1st phase including 12 levels for the new office, clash and error detection and publications, client communications, BIM management on BIM 360, Admin tasks of project management, Invoicing, publication of models, updating merged models, updating and exporting the latest DWGs.

QTS_Data Sheet_Ashburn-Shellhorn-DC2.jpg

QTS

BIM Coordination, Core and Shell

PROJECT TYPE: INDUSTRIAL
AREA: 15050 Sq. M.
COST: $46 Million

Responsibilities 

BIM coordination (Navisworks) and modelling (Revit) of the DC2 data centre, involved all floor plates of data halls and admin areas.
The special focus was fire suppression systems due to the criticality of equipment in a data centre. Apart from this, admin tasks and handling client relationships, organising and presenting in client meetings were my main focus for this project. 

Arrival-1_Web.jpg

Hyatt

BIM Coordination, Complete

PROJECT TYPE: COMMERCIAL
AREA: 21381 Sq. M.
COST: $107 Million

Responsibilities 

BIM coordination (Navisworks) and modelling (Revit) of the hotel at all levels and convention centre, clash and error detection and publications, client communications, BIM management on BIM 360, Admin tasks of project management, Invoicing, publication of models, updating merged models, updating and exporting the latest DWGs.

Screenshot 2023-03-30 150306.jpg

Vantage

CA3

BIM Coordination, Core and Shell

PROJECT TYPE: Industrial
AREA: 50040 Sq. M.
COST: $80 Million

Responsibilities 

Started as a lead in the project, mostly working on miscellaneous tasks and admin tasks and I had my small team running the clash detection. Another core and shell project with similar floor plates of an office. The challenging part was top to down approach in coordination as all the mechanic equipment was installed on the roof. 

5. Facebook FTW 4 Data Center, Fort Worth, Texas, USA

Responsibilities 

As built verfication from Point Cloud and manually marking errors greater than 4 inches, to develop a new as detailed model on BIM.

6. HCA MCA Hospital, Arlington, Texas, USA

Responsibilities 

BIM corrdination and clash detection

Architectural Trainee

7.jpg

GMN

1. GMN MEISSEN RING DER EINHEIT

PROJECT TYPE: RESIDENTIAL
LOCATION : MEISSEN, GERMANY
STATUS: CONSTRUCTION FINISHED
DATE: SUMMER 2020
POSITION: ARCHITECTURAL TRAINEE
JOB ARCHITECT: DIRK F SEHMSDORF

This is a housing project, which consists of 4 buildings of duplex houses, located on the outskirts of the nearby town of Meissen. This project is in the final stage of the design and is to generate final working drawings to begin construction.

Assigned Tasks
Working on stages from LP3 - LP5, Changes in outer wall size from 36.5 cm to 42.5 cm in working drawings to make the building more passive for energy savings according to the U-Value and then change the rest of the plan according to the new walls.
Updating Washroom Details, Updating Window Details, Addition of Drainage pipe in sections, Site Visits and Photo Documentation

2. CGW - CHEMNITZ  GRUNDSCHULE WESTSTRAßE

PROJECT TYPE: EDUCATIONAL INSTITUTE, LOCATION : CHEMNITZ, GERMANY

Assigned Tasks

For this project, I was creating LP5-level of working drawings. and I was assigned to all the side small things. I was crosschecking different data and updated existing drawings (LP5) according to new recommendations and information. My major element in this project was the construction layout plan and site documentation. Additionally also did partial BIM models on Vectorworks.
Working drawings on all levels, Updating Window Details, stair details, BIM modelling on Vectorworks, Site Visits and Photo Documentation

3. DBN WBW BERGMANNSTR, VONOVIA STRIESEN

PROJECT TYPE: RESIDENTIAL (Competition), LOCATION : DRESDEN, GERMANY

Assigned Tasks 
Concept Development, Site Visit (Photographic documentation), Calculations, Floor Planning, 3D Modelling (Old and New Building)

4. MIK WBW WOHENQUARTIERS, C1 AND C2

PROJECT TYPE: MIX USE (Competition), LOCATION : DRESDEN, GERMANY

Assigned Tasks 
Concept Development, Site Planning, 3D Modelling of facades and roof, 3D views generation, compilation, Parking Design and calculations

Assistant Architect

Portfolio5.jpg

Gadang

1. GADANG TOWER

PROJECT TYPE: HIGH RISE MIXED-USE
LOCATION: SELANGOR, MALAYSIA
STATUS: YET TO START
CLIENT : GADANG HOLDINGS BERHAD
POSITION: ASSISTANT ARCHITECT
JOB ARCHITECT: LAURENT LIM

Gadang Tower is a proposed one 80 storey tower for mixed development consisting of Offices, Serviced Suites and Hotel with two Podiums of F&B Retail mall and 6-storey car parks on two plots of land (2.66 Acres). At Jalan PJU 8/8A Damansara Perdana, 47820 Petaling Jaya, Selangor, Darul Ehsan, Malaysia for Gadang Holdings Berhad.

Assigned Tasks

In this project, I was assigned to the floor planning of Serviced Suites, Luxurious Suites, Sky Lobby and Ground floor lobby. The second stage was visualisation; we created several views of the interiors and exterior of the building. In an overall experience, we did meetings and presented ideas, GDV, cost (GDC) and profits to the investors after doing total sales value calculations.

Junior Architect

72.jpg

Edward's

1. EDWARD'S RESIDENCE

PROJECT TYPE: RESIDENTIAL
LOCATION: BANGALORE, KARNATAKA
STATUS: FINISHED CONSTRUCTION
CLIENT: EDWARD ELDO
DATE: SUMMER 2018
POSITION: JUNIOR ARCHITECT
JOB ARCHITECT: ZAIBA AHMED

BArch - Student - Academic Projects

bottom of page